Article 6.2 refrigerant abatement | Morocco

Föhn

Destroyed, not deferred.


1,500,000+ tCO2eproject impact goal
LocationMorocco
Project typeRecovery and destruction of high-GWP refrigerants
Potential scaleUp to 1.53 million tCO2e
Estimated impactAbout 300,000 tCO2e per year
Project period2026 to 2030
PartnersKliK Foundation and MTEDD
FrameworkParis Agreement Article 6.2 | Morocco to Switzerland ITMOs
SDGs
SDG 1: No PovertySDG 4: Quality EducationSDG 5: Gender EqualitySDG 8: Decent Work and Economic GrowthSDG 12: Responsible Consumption and Production
Fohn is an Article 6.2 project in Morocco that recovers and permanently destroys high-GWP refrigerants from end-of-life cooling equipment with end-to-end digital MRV.

The project

Safe recovery and permanent destruction of high-GWP refrigerants

Föhn establishes an integrated recovery-to-destruction system for high-global-warming-potential refrigerants contained in end-of-life cooling equipment across Morocco. The programme is developed with the Moroccan Ministry of Energy Transition and Sustainable Development and financed through the KliK Foundation under the Article 6.2 cooperation framework between Morocco and Switzerland.

The Kigali Amendment reduces future production and consumption of high-GWP refrigerants, but it does not eliminate the gases already installed in air conditioners, refrigerators, chillers and industrial systems. When end-of-life equipment is dismantled without proper recovery, those gases can be released directly into the atmosphere.

Föhn creates a national collection, recovery and destruction chain. Refrigerants are extracted by trained technicians, transported under controlled conditions and permanently destroyed using approved technology designed to achieve 99.99% destruction efficiency. A digital MRV system tracks each quantity from collection to final destruction, supporting the issuance and transfer of Internationally Transferred Mitigation Outcomes between Morocco and Switzerland.

Project outcomes

What changes on the ground.

01

Super-pollutant abatement

High-GWP gases are recovered and permanently destroyed before they can be released.

02

Authorised mitigation outcomes

The programme is structured around host-country authorisation, transparent accounting and corresponding adjustments.

03

Skilled workforce

Training and certification improve refrigerant handling across the cooling service sector.

04

Formal collection chain

Incentives and documented handover routes help move end-of-life equipment into controlled recovery and recycling pathways.

05

Digital traceability

Each kilogram is tracked from source equipment through storage, transport and final destruction.

Buyer fit

Government and compliance buyers seeking authorised mitigation outcomes under Article 6.2.

Availability

Commercial discussions are focused on Article 6 development, programme replication and authorised offtake structures.

Discuss this project